IT infrastructure projects

IT infrastructure projects,
finished on the agreed date.

ILS Networks plans and carries out IT infrastructure projects for businesses in Israel: a new office, an office move, a network upgrade, a server migration or a virtualization move. We map, design and deliver in stages, with a rollback plan for every change and documentation of what was actually delivered.

  • The same four stages in every project
  • A rollback plan for every material change
  • Coordination with other suppliers and contractors

Want an engineer to call you back?

The first consultation call is free · or message us on WhatsApp

Companies usually call us when...

  • You are moving office or opening a branch
  • You need to upgrade the network or the servers without stopping work
  • There are several suppliers, and each one waits for the other
  • Your IT person needs help with a large project

01 / What we do

What IT project management includes

From the mapping to the support after the handover.

  • U1 Mapping

    Systems, dependencies, risks and loads, and the business requirements as well as the technical ones.

  • U2 Design and IT consulting

    An architecture with alternatives and a budget, before anything is touched.

  • U3 Staged delivery

    In work windows you set, with acceptance tests for every stage.

  • U4 Supplier coordination

    The internet provider, the vendor, the electrician or the software supplier, kept in step so that no one waits for the other.

  • U5 Documentation

    What was installed, how it is configured and why, so that someone who was not on the project can handle a fault.

  • U6 After the handover

    Support and adjustments, or ongoing management if you want it. Managed IT

An engineer and an office manager going over a floor plan

02 / Before we start

Most projects fail before the work starts

So before anything is touched, we agree five things with you:

  1. What is handed over at the endAnd what the acceptance test looks like
  2. Who is responsible for whatOn our side and on yours
  3. The work windowsAnd what must stay running
  4. A rollback planFor every material change
  5. Outside suppliersAnd the dependency on their schedules

03 / How it works

How we work

The method does not change with the size of the project. Only the scope does.

Book a consultation →The first call is free
Stages
Mapping, design, delivery, go-live
Delivery
Staged, in work windows you set
Material changes
A rollback plan defined in advance
Acceptance tests
For every stage
Outside suppliers
Coordinated by us
Documentation
Of what actually exists
Price
A quote on a call with us
First consultation call
FreeNo commitment

04 / How to start

Four stages, and what each one delivers

  1. Mapping

    Delivered: A picture of the current state and the dependencies

  2. Design

    Delivered: Architecture, alternatives and budget

  3. Staged delivery

    Delivered: Stages with acceptance tests

  4. Go-live and support

    Delivered: Documentation and support after the handover

What does IT infrastructure project management include?

Managing an IT infrastructure project includes four stages: mapping the current state, designing the architecture and the alternatives, staged delivery with acceptance tests, and go-live and support after the handover.

Every stage ends with documentation of what was actually delivered, and not with a list of ticked tasks.

Why do IT infrastructure projects fail?

Most infrastructure projects fail before the work starts, and not during it: no one mapped what is connected to what, no one defined what happens if a stage does not work, or the dependency between suppliers shows up only on the day of the move.

That is why the same method repeats in every project, small or large. Only the scope changes.

What happens if a stage fails halfway?

Every material change has a way back that is defined in advance, so a stage that does not work returns to the previous state without disrupting work.

What does good documentation look like at the end of a project?

Good documentation describes what actually exists: what was installed, how it is configured, why those settings were chosen, and what you need to know to maintain them.

The simple test: can someone who was not on the project handle a fault from the document.

Why us

Why choose ILS Networks for an infrastructure project

  1. Four defined stages

    Mapping, design, delivery and handover, with a written deliverable at the end of each stage.

  2. Staged delivery with a rollback plan

    Every stage is tested before we go on, and you can go back.

  3. Alongside your IT team too

    We carry out the project, and your team stays in the picture and gets full documentation.

Questions about
infrastructure projects.

Related services:

Do you work alongside our in-house IT team?

Yes, and it is the common case. What matters is to define in advance who is responsible for what.

Do you also manage the other suppliers in the project?

Yes. Most projects involve more than one party, and part of the work is to keep them in step and manage the dependencies, so that no side waits for the other.

Do we have to commit to a monthly service?

No. You can work with us on a single project. If you want, you can continue afterwards to support or ongoing management.

How much does an IT infrastructure project cost?

It depends on the scope. After an introduction call and the mapping you get a clear written quote. The first call is free.

Which areas do you cover?

All of Israel.

Have a project on the table?

Tell us what is planned and when. An engineer will get back to you, and the first call is free.

Your details are used to answer the enquiry, under our privacy information.

Talk to us
Call WhatsApp