Case study · Ariston Group (Chromagen)

Full infrastructure management: virtualization, storage, security and 10 branches

We have managed the whole IT estate for Chromagen of Ariston Group for about six years. Among the projects: a controlled VMware to Proxmox migration with backup and DR, an enterprise storage migration to IBM Storage 5300, Aruba campus switching, and a Sophos security stack running ten branches under one policy.

Read the full story ↓Ask an engineer

A multi-site organization needing orderly infrastructure and unified security

Chromagen of Ariston Group operates across several sites and branches, and we have run its entire IT estate for about six years — not a single project but standing responsibility for virtualization, storage, networking and security.

The most recent major project was moving the virtualization environment from VMware to Proxmox, alongside an enterprise storage migration to IBM Storage 5300, Aruba switching across the campus network, and unifying the security policy of the head office and ten branches under one management.

The work was planned as a staged infrastructure change, so every phase runs in a controlled way with a rollback plan defined in advance.

Background

The organization wanted to move to a more flexible virtualization platform and, at the same time, unify the security policy of the head office and the branches under a single management, instead of separate solutions per site.

The solution

  • Virtualization: a controlled migration of workloads from VMware to Proxmox, including backup and DR.
  • Storage: an enterprise storage migration to IBM Storage 5300.
  • Networking: Aruba switching deployed across the campus network.
  • Information security: a Sophos-based infrastructure as the central protection layer.
  • Branch connectivity: ten branches connected to the central site on redundant links over Sophos RED, so every site operates under a single, centrally managed security policy.

How the Proxmox migration was carried out

One principle governed the whole project: at no point did production depend on the new environment being right. There was always somewhere to fall back to.

Before a single production server was touched, a temporary Proxmox host was built alongside the existing environment — a leased server with network and FC cards — and a Proxmox-compatible logical volume was prepared on the storage array. Nothing in production changed at that stage.

The critical systems were tested first. The ERP and the logistics ERP were migrated as a test and put through full functional testing before any general migration began. Those are the systems the business runs on, and if they do not work, nothing else matters.

Only then were virtual machines moved off one of the VMware hosts onto the temporary server, and a Proxmox Backup Server was stood up and backups taken — so a restore point already existed before any production host was converted.

The conversion itself ran host by host: the first production server was converted from VMware to Proxmox and the remaining machines moved onto it, then the second server was converted and the machines on the temporary host moved across. Full backup scenarios were configured on the PBS server, the temporary host was dismantled, and the DR server was converted last, with scripts to clone or restore from backup.

The migration completed in full, without incident, and the environment runs on Proxmox.

What was done, by area

Virtualization
VMware to Proxmox, with DR and backup
Storage
Migration to IBM Storage 5300
Networking
Aruba switching across the campus
Information security
Sophos infrastructure
Branch connectivity
10 branches on redundant links to the central site

Technologies: Proxmox · VMware · Proxmox Backup Server · IBM Storage 5300 · Aruba · Sophos · Sophos RED

Want a similar migration? Start with a feasibility review.

A short professional call with the team: what runs today, what is critical, and what an orderly migration would take — no commitment.